Braton Civil Engineering and Construction Projects.



Contract - Construction of the new Altnagelvin Hospital Radiotherapy Unit, Derry, BT47 6SB (Groundworks)

Client - McLaughlin & Harvey Ltd.
Value - £2,500000
Duration - 24 months
Works involved:
Site Clearance
60,000m3 bulk excavation
Basement carpark excavation
Foundation excavation
New service tunnel excavation & excavation below existing tunnels
Deep drainage (7 - 8 m depth) excavation / installation
Sewer diversion works
Service utility excavation / installation
Carpark & road construction
Hard & soft landscape external works

 
Altnagelvin Hospital


Please click image to view photos of Project



Contract - Construction of Retail Unit, Oaks Retail Park, Dungannon (Groundworks)

Client - McLaughlin & Harvey Ltd.
Value - £400,000
Duration - 6 months
Works involved:
Setting out of works
Site clearance
Diversion of existing Local Authority 7.0m deep culverts & water mains
Bulk excavation
R.C foundation excavation / installation
Substructure blockwork
Internal & external drainage / service utility excavation / installation
Radon membrane installation
R.C floor construction
R.C service yard construction
Hard & soft landscaping external works
Fencing

 
Retail Unit, Oaks Retail Park, Dungannon

Please click image to view photos of Project



Contract - Construction of 2 x extensions (ext. 1 = 1250m2, ext. 2 = 350m2) to existing factory unit, Strabane (Groundworks)

Client - Fabplus Ltd.
Value - £100,000
Duration - 2 months
Works involved:
Setting out of works
Site clearance
Internal & external drainage / service utility excavation / installation
R.C foundation excavation / installation
Substructure blockwork
Radon membrane installation
R.C floor construction

 
Fabplus

Please click image to view photos of Project



Contract - Construction of the new 4000m2 carpark, Sligo Institute of Technology, Ballinode, Co Sligo (Groundworks)

Client - BAM.
Value - £200,000
Duration - 2 months
Sligo IT phase 1
Works involved:
Setting out of works
Site Clearance
Drainage excavation / installation
Service utility excavation / installation
Carpark construction
Hard & soft landscape external works

 
Sligo Institute of Technology

Please click image to view photos of Project



Contract - Construction of new 4272m2 extension to the Science Department and new Canteen, Kitchen at Block B Sligo Institute of Technology, Ballinode, Co. Sligo (Groundworks)

Client - BAM.
Value - €1,000,000
Duration - 16 months
Sligo IT phase 2
Works involved:
Setting out of works
Site Clearance
Diversion of existing Local Authority foul sewers & water mains
Foundation excavation
Installation of internal & external drainage
Service utility excavation / installation
All works to underside of R.C ground floor construction
Road construction
Construction of R.C entrance ramps / walls / steps
Hard & soft landscape external works

 
Sligo Institute of Technology

Please click image to view photos of Project



Contract - Construction of the new KFC restaurant (Shell Modification of existing structure) with internal drive through facility, Clondalkin, Dublin (Shell Modification / Groundworks)

Client - McLaughlin & Harvey Ltd.
Value - £150,000
Duration - 2 months
Works involved:
Setting out of works
Demolition of R.C walls / stairs & section of 1st. floor hollow core slab
Break out exist. R.C ground floor slab to excavate / Install of R.C foundation bases for steel frame structure
Internal & external drainage & service utility excavation / installation,
R.C floor construction to ground + 1st floors + R.C upstand walls
Hard & soft landscape external works

 
KFC Dublin

Please click image to view photos of Project



Contract - Development Bond completion works @ Brookfield Manor, Donegal Town (Groundworks)

Client - KCS Construction Consultants.
Value - £
Duration - 1 month
Works involved:
Setting out of works
Jetting / CCTV of foul & storm drainage network
Repair works to foul / storm drains to comply with the requirements of BS 8005: Part 1, BS 8301
Install petrol interceptor on storm drainage prior to discharge into existing water course
Existing Sewage Treatment Plant removed
Repair / upgrade works to roads & footpaths to comply with the requirements of "Specification for Road Works" published by the National Roads Authority.
Repair / replace damaged kerbs
Repair damaged base course in roads & footpaths
Raise manhole covers / gully covers to wearing course level
Install 40mm wearing course to all road surfaces
Install 40mm base course & 25mm wearing course to areas of paths to be completed
Street lighting repaired to ESB Lighting Division Spec
Install fire hydrant marker posts & plates
Make good soft / hard landscaping to open space areas / plant 19 No. trees

 
Brookfield

Please click image to view photos of Project




 